Bill Summary for S 353 (2019-2020)
Printer-friendly: Click to view
Summary date:
Aug 13 2019
Bill Information:
View NCGA Bill Details | 2019-2020 Session |
AN ACT TO ALLOW FOR THE LAYING OFF OF A CARTWAY OF UP TO THIRTY FEET AND TO CLARIFY CERTAIN SEPTIC TANK SETBACKS.Intro. by McInnis, Gunn, Wells.
View: All Summaries for Bill | Tracking: |
Bill summary
House amendment #2 makes the following changes to the 3rd edition, as previously amended.
Adds the following to the provision establishing the minimum horizontal distance between sanitary sewage treatment and disposal systems to downslope interceptor drains, foundation drains, and stormwater diversions to be 15 feet. Limits the scope of 15A NCAC 18A .1950(a)(15), which establishes minimum distances from drainage systems ranging from 10 to 25 feet, to stormwater diversions with cuts of 2 feet or more in vertical height.