AN ACT TO PERMIT THE LOWER CAPE FEAR WATER AND SEWER AUTHORITY TO UTILIZE THE DESIGN-BUILD METHOD OF CONSTRUCTION FOR A FOURTEEN-MILE PARALLEL WATER TRANSMISSION LINE WITHIN ITS SERVICE AREA. Summarized in Daily Bulletin 5/30/12. Enacted June 26, 2012. Effective June 26, 2012.
LOWER CAPE FEAR DESIGN-BUILD.
Printer-friendly: Click to view
View NCGA Bill Details(link is external) | 2011-2012 Session |
TO PERMIT THE LOWER CAPE FEAR WATER AND SEWER AUTHORITY TO UTILIZE THE DESIGN BUILD METHOD OF CONSTRUCTION FOR A FOURTEEN MILE PARALLEL WATER TRANSMISSION LINE WITHIN ITS SERVICE AREA.Intro. by Rabon.
Status: Ch. SL 2012-60 (Senate Action) (Jun 26 2012)
Bill History:
-
Wed, 30 May 2012 Senate: Filed(link is external)
-
Thu, 31 May 2012 Senate: Passed 1st Reading(link is external)
-
Thu, 31 May 2012 Senate: Ref To Com On State and Local Government(link is external)
-
Thu, 7 Jun 2012 Senate: Reptd Fav(link is external)
-
Mon, 11 Jun 2012 Senate: Passed 2nd & 3rd Reading(link is external)
-
Mon, 11 Jun 2012 House: Rec From Senate(link is external)
-
Mon, 11 Jun 2012 House: Passed 1st Reading(link is external)
-
Mon, 11 Jun 2012 House: Ref To Com On Government(link is external)
-
Thu, 21 Jun 2012 House: Reptd Fav(link is external)
-
Thu, 21 Jun 2012 House: Cal Pursuant Rule 36(b)(link is external)
-
Thu, 21 Jun 2012 House: Placed On Cal For 6/25/2012(link is external)
-
Mon, 25 Jun 2012 House: Passed 2nd & 3rd Reading(link is external)
-
Tue, 26 Jun 2012 Ratified(link is external)
-
Tue, 26 Jun 2012 Ch. SL 2012-60(link is external)
S 934/S.L. 2012-60
Bill Summaries:
-
Summary date: Jun 27 2012 - View Summary
-
Bill S 934 (2011-2012)Summary date: May 30 2012 - View Summary
As the title indicates. Provides guidelines for prequalifying and soliciting bids from design-build teams for the project. Authorizes the Lower Cape Fear Water and Sewer Authority to contract for the construction of a 14-mile parallel water transmission line within its service area. This act expires December 31, 2015.