TO PERMIT THE LOWER CAPE FEAR WATER AND SEWER AUTHORITY TO UTILIZE THE DESIGN BUILD METHOD OF CONSTRUCTION FOR A FOURTEEN MILE PARALLEL WATER TRANSMISSION LINE WITHIN ITS SERVICE AREA.Intro. by Rabon.
View: All Summaries for Bill | Tracking: |
Bill summary
As the title indicates. Provides guidelines for prequalifying and soliciting bids from design-build teams for the project. Authorizes the Lower Cape Fear Water and Sewer Authority to contract for the construction of a 14-mile parallel water transmission line within its service area. This act expires December 31, 2015.