LOWER CAPE FEAR DESIGN-BUILD.

Printer-friendly: Click to view
View NCGA Bill Details2011-2012 Session
Senate Bill 934 (Local) Filed Wednesday, May 30, 2012
TO PERMIT THE LOWER CAPE FEAR WATER AND SEWER AUTHORITY TO UTILIZE THE DESIGN BUILD METHOD OF CONSTRUCTION FOR A FOURTEEN MILE PARALLEL WATER TRANSMISSION LINE WITHIN ITS SERVICE AREA.
Intro. by Rabon.

Status: Ch. SL 2012-60 (Senate Action) (Jun 26 2012)

Bill History:

S 934/S.L. 2012-60

Bill Summaries:

  • Summary date: Jun 27 2012 - View Summary

    AN ACT TO PERMIT THE LOWER CAPE FEAR WATER AND SEWER AUTHORITY TO UTILIZE THE DESIGN-BUILD METHOD OF CONSTRUCTION FOR A FOURTEEN-MILE PARALLEL WATER TRANSMISSION LINE WITHIN ITS SERVICE AREA. Summarized in Daily Bulletin 5/30/12. Enacted June 26, 2012. Effective June 26, 2012.


  • Summary date: May 30 2012 - View Summary

    As the title indicates. Provides guidelines for prequalifying and soliciting bids from design-build teams for the project. Authorizes the Lower Cape Fear Water and Sewer Authority to contract for the construction of a 14-mile parallel water transmission line within its service area. This act expires December 31, 2015.