TO PERMIT THE LOWER CAPE FEAR WATER AND SEWER AUTHORITY TO UTILIZE THE DESIGN BUILD METHOD OF CONSTRUCTION FOR A FOURTEEN MILE PARALLEL WATER TRANSMISSION LINE WITHIN ITS SERVICE AREA.Intro. by Rabon.
View: All Summaries for Bill | Tracking: |
Bill summary
AN ACT TO PERMIT THE LOWER CAPE FEAR WATER AND SEWER AUTHORITY TO UTILIZE THE DESIGN-BUILD METHOD OF CONSTRUCTION FOR A FOURTEEN-MILE PARALLEL WATER TRANSMISSION LINE WITHIN ITS SERVICE AREA. Summarized in Daily Bulletin 5/30/12. Enacted June 26, 2012. Effective June 26, 2012.