AN ACT TO ADD A LICENSED SOIL SCIENTIST TO THE ON-SITE WASTEWATER CONTRACTORS AND INSPECTORS CERTIFICATION BOARD. SL 2021-38. Enacted June 16, 2021. Effective July 1, 2021.
Bill Summaries: H139 SOIL SCIENTIST/ON-SITE WASTEWATER CERT. BD.
Printer-friendly: Click to view
-
Bill H 139 (2021-2022)Summary date: Jun 16 2021 - View Summary
-
Bill H 139 (2021-2022)Summary date: Mar 4 2021 - View Summary
House committee substitute to the 1st edition makes the following changes. Amends GS 90A-73(a)(9) to correct the reference to licensure as a soil scientist licensed to being under GS Chapter 89F (was, Article 89F). Makes an additional technical change.
-
Bill H 139 (2021-2022)Summary date: Feb 23 2021 - View Summary
Amends the qualifications of the member of the NC On-Site Wastewater Contractors and Inspectors Certification Board appointed by the NCGA based on the recommendation of the House Speaker, pursuant to GS 90A-73(a)(9). Requires the member to be, at the time of appointment, a soil scientist licensed under Article 89F with experience in the soil and site evaluation for on-site wastewater systems (currently, required to be employed by the NC Cooperative Extension Service and knowledgeable in the area of on-site wastewater systems). Effective July 1, 2021.