AN ACT TO EXPAND THE TYPE OF DEVELOPMENT CONNECTIONS TO WATER SUPPLY LINES FUNDED BY THE CLEAN WATER AND NATURAL GAS CRITICAL NEEDS BOND ACT OF 1998. SL 2021-37. Enacted June 16, 2021. Effective June 16, 2021, and applies to requests for waivers to allow additional water lines submitted on or before that date.
Bill Summaries: H 20 1998 CLEAN WATER BOND ADD'L CONNECTIONS.
Printer-friendly: Click to view
-
Bill H 20 (2021-2022)Summary date: Jun 16 2021 - View Summary
-
Bill H 20 (2021-2022)Summary date: Mar 9 2021 - View Summary
House committee substitute to the 1st edition makes the following changes. Adds that the act applies to requests for waivers to allow additional water lines submitted on or before the date that the act becomes law.
-
Bill H 20 (2021-2022)Summary date: Jan 27 2021 - View Summary
Amends Section 5 of SL 2011-412 to also allow additional connections to a bond-funded waterline within a WS-I area or the critical area of any area designated WS-II, WS-III or WS-IV, in order to provide water to a structure located on a lot zoned for residential or mixed-use development (was, to a habitable structure located on a lot zoned for a single-family residence). Maintains the requirement that the design capacity and size of the existing waterline can accommodate the additional connections. Makes additional conforming and technical changes.