Amends GS 143-215.31(a1)(2)d. by exempting a dam that is less than 15 feet in height or that has an impoundment capacity of less than 50 acre-feet from the requirement to include a downstream inundation map in its emergency action plan, unless site-specific factors justify the inclusion of a map.
Clarifies that a downstream inundation map for an emergency action plan does not have to be prepared by a licensed professional engineer or a person under their supervision unless the dam is associated with a coal combustion residuals surface impoundment by adding new GS 143-215.31(a1)(2a).
Effective and applicable to all emergency action plans submitted or updated on or after July 1, 2025.
REVISE DAM SAFETY REQUIREMENTS.
Printer-friendly: Click to view
View NCGA Bill Details(link is external) | 2025-2026 Session |
AN ACT TO CLARIFY THE EMERGENCY ACTION PLAN REQUIREMENTS FOR CERTAIN DAMS.Intro. by Lazzara, Sawyer, Johnson.
Status: Ref To Com On Rules and Operations of the Senate (Senate action) (Mar 26 2025)
Bill History:
-
Tue, 25 Mar 2025 Senate: Filed(link is external)
-
Wed, 26 Mar 2025 Senate: Passed 1st Reading(link is external)
S 614
Bill Summaries:
-
Bill S 614 (2025-2026)Summary date: Mar 28 2025 - View Summary
View: All Summaries for Bill