AN ACT TO CLARIFY THE DEFINITION OF BUILT-UPON AREA FOR PURPOSES OF STORMWATER PROGRAMS. Enacted July 16, 2015. Effective July 16, 2015.
Bill Summaries: all (2015-2016 Session)
-
Bill H 634 (2015-2016)Summary date: Jul 16 2015 - View summary
-
Bill H 634 (2015-2016)Summary date: Jun 29 2015 - View summary
Senate amendment makes the following changes to the 3rd edition.
Amends GS 143-214.7 to exclude from the definition for built-upon area for the purposes of implementing stormwater programs, a trail as defined in GS 113A-85 that is either unpaved or paved as long as the pavement is porous with a hydraulic conductivity greater than 0.001 centimeters per second (1.41 inches per hour) (was, a trail as defined in GS 113A-85).
-
Bill H 634 (2015-2016)Summary date: Jun 24 2015 - View summary
Senate committee substitute makes the following changes to the 2nd edition.
Amends GS 143‑214.7 to exclude from the definition for built-upon area, for the purposes of implementing stormwater programs, trails as defined in GS 113A-85, including park trails, designated trails, state scenic or recreation trails, or other trails open to the public as specified.
-
Bill H 634 (2015-2016)Summary date: Apr 23 2015 - View summary
House committee substitute to the 1st edition makes a clarifying change.
-
Bill H 634 (2015-2016)Summary date: Apr 13 2015 - View summary
Amends GS 143‑214.7 to also exclude from built-upon area, for the purposes of implementing stormwater programs, a surface of number 57 stone, as designated by the American Society for Testing and Materials, that is laid at least 4 inches thick over a geotextile fabric. Requires the Environmental Management Commission to issue rules to this effect no later than December 1, 2015.