As the title indicates. Provides guidelines for prequalifying and soliciting bids from design-build teams for each project. Authorizes the Lower Cape Fear Water and Sewer Authority to contract for the construction of water projects within its service area. This act expires December 31, 2015.
Bill Summary for S 947 (2011-2012)
Printer-friendly: Click to view
Summary date:
May 30 2012
Bill Information:
View NCGA Bill Details | 2011-2012 Session |
TO PERMIT THE LOWER CAPE FEAR WATER AND SEWER AUTHORITY TO UTILIZE THE DESIGN-BUILD METHOD OF CONSTRUCTION OF WATER PROJECTS.Intro. by Rabon.
View: All Summaries for Bill | Tracking: |
Bill summary
Identical to H 1016, filed 5/21/12.