Bill Summaries: H783 PILOT PROGRAM TO CLEAR DOT PIPES/CULVERTS.

Tracking:
  • Summary date: Apr 16 2019 - More information

    Directs the Department of Transportation (DOT) to establish a pilot program to locate, classify, and clear draining issues in Highway Division 1 by September 1, 2019. Details required components of the program, including locating and recording GPS coordinates of specified culverts and drainage conveyances, classifying and designating the conditions and needs of each, clearing or repairing the culverts, and developing an ongoing inspection schedule for the culverts. Terminates the program on September 1, 2021. Appropriates $2 million in nonrecurring funds from the Highway Fund to DOT for the 2019-21 fiscal biennium to conduct the pilot program. Directs DOT to report to the specified NCGA committee on the program's progress on September 1, 2020, and September 1, 2021. Effective July 1, 2019.


© 2022 School of Government The University of North Carolina at Chapel Hill

This work is copyrighted and subject to "fair use" as permitted by federal copyright law. No portion of this publication may be reproduced or transmitted in any form or by any means without the express written permission of the publisher. Distribution by third parties is prohibited. Prohibited distribution includes, but is not limited to, posting, e-mailing, faxing, archiving in a public database, installing on intranets or servers, and redistributing via a computer network or in printed form. Unauthorized use or reproduction may result in legal action against the unauthorized user.

Printer-friendly: Click to view