A BILL TO BE ENTITLED AN ACT TO ALLOW BUNCOMBE COUNTY TO USE THE DESIGN-BUILD METHOD OF CONSTRUCTION. Enacted April 23, 2013. Effective April 23, 2013, and expires June 30, 2016.
BUNCOMBE COUNTY/USE DESIGN-BUILD METHODS.
Printer-friendly: Click to view
View NCGA Bill Details(link is external) | 2013-2014 Session |
A BILL TO BE ENTITLED AN ACT TO ALLOW BUNCOMBE COUNTY TO USE THE DESIGN-BUILD METHOD OF CONSTRUCTION.Intro. by Moffitt, Ramsey.
Bill History:
-
Tue, 5 Mar 2013 House: Filed(link is external)
-
Wed, 6 Mar 2013 House: Passed 1st Reading(link is external)
-
Mon, 18 Mar 2013 House: Reptd Fav Com Substitute(link is external)
-
Mon, 18 Mar 2013 House: Re-ref Com On Finance(link is external)
-
Wed, 27 Mar 2013 House: Withdrawn From Com(link is external)
-
Wed, 27 Mar 2013 House: Cal Pursuant Rule 36(b)(link is external)
-
Wed, 27 Mar 2013 House: Placed On Cal For 03/28/2013(link is external)
-
Thu, 28 Mar 2013 House: Amend Adopted A1(link is external)
-
Thu, 28 Mar 2013 House: Passed 2nd Reading(link is external)
-
Thu, 28 Mar 2013 House: Passed 3rd Reading(link is external)
-
Thu, 28 Mar 2013 House: Ordered Engrossed(link is external)
-
Tue, 2 Apr 2013 Senate: Rec From House(link is external)
-
Tue, 2 Apr 2013 Senate: Passed 1st Reading(link is external)
-
Wed, 10 Apr 2013 Senate: Reptd Fav Com Substitute(link is external)
-
Wed, 10 Apr 2013 Senate: Com Substitute Adopted(link is external)
-
Wed, 10 Apr 2013 Senate: Placed On Cal For 04/16/2013(link is external)
-
Tue, 16 Apr 2013 Senate: Passed 2nd Reading(link is external)
-
Tue, 16 Apr 2013 Senate: Passed 3rd Reading(link is external)
-
Wed, 17 Apr 2013 House: Rec To Concur S Com Sub(link is external)
-
Wed, 17 Apr 2013 House: Rec From Senate(link is external)
-
Thu, 18 Apr 2013 House: Cal Pursuant 36(b)(link is external)
-
Thu, 18 Apr 2013 House: Placed On Cal For 04/22/2013(link is external)
-
Mon, 22 Apr 2013 House: Concurred In S/Com Sub(link is external)
-
Mon, 22 Apr 2013 House: Ordered Enrolled(link is external)
-
Tue, 23 Apr 2013 Ratified(link is external)
-
Tue, 23 Apr 2013 Ch. SL 2013-31(link is external)
Bill Summaries:
-
Summary date: Apr 23 2013 - View Summary
-
Bill H 222 (2013-2014)Summary date: Apr 10 2013 - View Summary
House committee substitute makes the following changes to the 3rd edition. Requires Buncombe County to award the contract to the best qualified team, taking into consideration all facets of the project, including compliance with GS 143-128.2 (minority business participation goals), removing consideration of project completion time and costs.
-
Bill H 222 (2013-2014)Summary date: Mar 28 2013 - View Summary
House amendment to the 2nd edition makes the following changes. Provides that Buncombe County may use the design-build method of construction for the construction or renovation of buildings, facilities, and infrastructure owned by the County (was, City). The act only applies to those activities for a specified economic development project in Asheville.
-
Bill H 222 (2013-2014)Summary date: Mar 18 2013 - View Summary
House committee substitute makes the following changes to the 1st edition.
Allows Buncombe County to use the design-build method of construction for the construction or renovations of buildings, facilities, and infrastructure owned by the city of Asheville (was, for any road, water, sewer, sidewalk, public facility, and any other public infrastructure). Requires that the county solicit three (was, two) teams to bid the project, receive at least three (was, two) sealed proposals, and interview at least three (was, two) teams.
Sets the act to expire on June 30, 2016.
-
Bill H 222 (2013-2014)Summary date: Mar 5 2013 - View Summary
Provides that despite the provisions of GS 143-128, GS 143-129, GS 143-131, GS 143-132, GS 143-64.31, and GS 143-64.32, Buncombe County is permitted to use the design-build construction method for any road, water, sewer, sidewalk, public facility, and any other public infrastructure. Provides additional criteria governing the solicitation of bids and the selection of the best qualified team with whom to contract for the project.
Provides that this act applies only to the demolition and construction of structures for an economic development project at 502 Sweeten Creek Industrial Park in Asheville.