Bill Summary for H 352 (2017-2018)

Summary date: 

Mar 14 2017

Bill Information:

View NCGA Bill Details2017-2018 Session
House Bill 352 (Public) Filed Tuesday, March 14, 2017
AN ACT AUTHORIZING THE UTILITIES COMMISSION TO USE A FULLY PROJECTED FUTURE TEST PERIOD IN RATE MAKING FOR WATER AND WASTEWATER PUBLIC UTILITIES.
Intro. by Watford, Collins.

View: All Summaries for BillTracking:

Bill summary

Enacts new GS 62­133(c1), authorizing water or wastewater public utilities to use a fully projected future test period in lieu of the test period provided in subsection (c). Directs the Utilities Commission (Commission), when using a fully projected future test period, to determine the projected rate base at the end of the future test period. Directs the Commission to adopt rules and regulations regarding submission requirements for fully projected future test periods. Directs a public utility that uses a fully projected future test period as part of a final rate determination by the Commission to provide appropriate data evidencing the accuracy of the estimates, and authorizes the Commission to adjust the public utility's rates on the basis of that data after notice and hearing. Directs the Commission to permit facilities projected to be in service during the fully projected future test period to be included in the base rate.

© 2022 School of Government The University of North Carolina at Chapel Hill

This work is copyrighted and subject to "fair use" as permitted by federal copyright law. No portion of this publication may be reproduced or transmitted in any form or by any means without the express written permission of the publisher. Distribution by third parties is prohibited. Prohibited distribution includes, but is not limited to, posting, e-mailing, faxing, archiving in a public database, installing on intranets or servers, and redistributing via a computer network or in printed form. Unauthorized use or reproduction may result in legal action against the unauthorized user.

Printer-friendly: Click to view