Bill Summaries: S 809 ENVIRONMENTAL TECHNICAL CORRECTIONS 2012.

Printer-friendly: Click to view
Tracking:
  • Summary date: May 17 2012 - View Summary

    Identical to H 953, filed 5/16/12.

    Amends GS 113A-115.1 (limitations on erosion control structures) to codify requirements included in SL 2011-387, which direct the Coastal Resources Commission to report to the Environmental Review Commission, by September 1 each year, on each permitted terminal groin and its accompanying beach fill project, as specified. Amends GS 143-214.11 to codify the order of preference in which the Ecosystem Enhancement Program must use the specified programs to provide for compensatory mitigation (requirements currently included in SL 2011-343). Makes conforming changes to the respective session laws, GS 113-182.1(e), and GS 143B-279.8(f).