AN ACT TO PERMIT THE COUNTIES OF WAYNE AND CURRITUCK TO UTILIZE THE DESIGN-BUILD METHOD OF CONSTRUCTION AND RENOVATION OF COUNTY BUILDINGS. Summarized in Daily Bulletin 3/9/11, 4/11/11, 4/13/11, and 5/18/11. Enacted May 26, 2011. Effective May 26, 2011.
WAYNE COUNTY DESIGN BUILD.
Printer-friendly: Click to view
View NCGA Bill Details | 2011-2012 Session |
TO PERMIT THE COUNTY OF WAYNE TO UTILIZE THE DESIGN-BUILD METHOD OF CONSTRUCTION AND RENOVATION OF COUNTY BUILDINGS.Intro. by Sager.
Bill History:
-
Wed, 9 Mar 2011 House: Filed
-
Thu, 10 Mar 2011 House: Passed 1st Reading
-
Thu, 10 Mar 2011 House: Ref To Com On Government
-
Mon, 11 Apr 2011 House: Reptd Fav Com Substitute
-
Mon, 11 Apr 2011 House: Cal Pursuant Rule 36(b)
-
Tue, 12 Apr 2011 House: Placed On Cal For 4/13/2011
-
Wed, 13 Apr 2011 House: Amend Adopted 1
-
Wed, 13 Apr 2011 House: Passed 2nd Reading
-
Thu, 14 Apr 2011 House: Passed 3rd Reading
-
Thu, 14 Apr 2011 House: Ordered Engrossed
-
Fri, 15 Apr 2011 Senate: Rec From House
-
Tue, 19 Apr 2011 Senate: Passed 1st Reading
-
Tue, 19 Apr 2011 Senate: Ref To Com On State and Local Government
-
Wed, 18 May 2011 Senate: Reptd Fav Com Substitute
-
Wed, 18 May 2011 Senate: Com Substitute Adopted
-
Thu, 19 May 2011 Senate: Passed 2nd & 3rd Reading
-
Tue, 24 May 2011 House: Rec To Concur S Com Sub
-
Tue, 24 May 2011 House: Cal Pursuant Rule 36(b)
-
Tue, 24 May 2011 House: Placed On Cal For 5/25/2011
-
Wed, 25 May 2011 House: Concurred In S/Com Sub
-
Thu, 26 May 2011 Ratified
-
Thu, 26 May 2011 Ch. SL 2011-98
Bill Summaries:
-
Summary date: Jun 1 2011 - View Summary
-
Bill H 284 (2011-2012)Summary date: May 18 2011 - View Summary
Senate committee substitute makes the following changes to 3rd edition. Provides that proposals submitted under the act by design-build teams are not required to include project design solutions.
-
Bill H 284 (2011-2012)Summary date: Apr 13 2011 - View Summary
House amendment makes the following changes to 2nd edition. Adds provisions authorizing Currituck County to contract for construction or renovation of county buildings notwithstanding GS Chapter 143, Article 8 (public contract bidding procedures). Requires county to award contract to best qualified contractor in light of time to complete project and cost.
-
Bill H 284 (2011-2012)Summary date: Apr 11 2011 - View Summary
House committee substitute makes the following changes to 1st edition. Requires Wayne County to receive at least three (was, two) sealed proposals. Allows the county to proceed with the proposals received if three proposals are not received and the project has been publicly advertised for at least 30 days. Sets the act to expire on December 31, 2014.
-
Bill H 284 (2011-2012)Summary date: Mar 9 2011 - View Summary
As the title indicates. Provides requirements regarding soliciting bids and reviewing proposals.