Identical to H 352 filed on 3/14/17.
Enacts new GS 62-133(c1), authorizing water or wastewater public utilities to use a fully projected future test period in lieu of the test period provided in subsection (c). Directs the Utilities Commission (Commission), when using a fully projected future test period, to determine the projected rate base at the end of the future test period. Directs the Commission to adopt rules and regulations regarding submission requirements for fully projected future test periods. Directs a public utility that uses a fully projected future test period as part of a final rate determination by the Commission to provide appropriate data evidencing the accuracy of the estimates, and authorizes the Commission to adjust the public utility's rates on the basis of that data after notice and hearing. Directs the Commission to permit facilities projected to be in service during the fully projected future test period to be included in the base rate.
RATE MAKING/WATER/WASTEWATER PUBLIC UTILITIES.
Printer-friendly: Click to view
View NCGA Bill Details | 2017-2018 Session |
AN ACT AUTHORIZING THE UTILITIES COMMISSION TO USE A FULLY PROJECTED FUTURE TEST PERIOD IN RATE MAKING FOR WATER AND WASTEWATER PUBLIC UTILITIES.Intro. by Meredith.
Status: Ref To Com On Rules and Operations of the Senate (Senate Action) (Mar 22 2017)
Bill History:
-
Tue, 21 Mar 2017 Senate: Filed
-
Wed, 22 Mar 2017 Senate: Passed 1st Reading
-
Wed, 22 Mar 2017 Senate: Ref To Com On Rules and Operations of the Senate
S 340
Bill Summaries:
-
Bill S 340 (2017-2018)Summary date: Mar 21 2017 - View Summary
View: All Summaries for Bill